Teams sometimes expect a development review to be a code inspection with certification terminology around it. The deeper question is whether the project’s requirements, design, code, reviews, traces, and controls are operating as one life cycle under the coordinated planning approach.
Short answer: The certification authority samples development data to assess whether system inputs become accurate software requirements, requirements become a compliant design and source code, and every transition is traceable, reviewed, controlled, and consistent with the project’s plans and standards. The review tests the implemented process and evidence—not whether one artifact looks polished in isolation.
By AeroCert Institute — a federally recognized 501(c)(3) nonprofit organization founded by aviation safety professionals with FAA credentials. Reviewed August 2026.
The review follows the development chain
The familiar development-stage review occurs after planning and before verification is complete. Its value comes from examining a process while enough real data exists to reveal patterns and enough work remains for corrections to affect the project.
Many programs organize software reviews around four familiar maturity points—planning, development, verification, and final—often called Stage of Involvement (SOI) 1 through SOI 4. That terminology comes from the Federal Aviation Administration’s (FAA’s) historical Software Review Job Aid. Current FAA Order 8110.49A does not mandate four reviews; the authority determines the scope and number of reviews, if any, for each project.
When a development-stage review is part of the agreed approach, the authority or authorized designee examines how the planning baseline has been implemented. Requirements, design, code, development standards, verification records produced so far, configuration-management records, quality-assurance records, problem reports, tool data, and earlier review results may all be relevant to the selected scope.
The review is commonly performed through sampling. FAA Order 8110.49A describes sampling as inspecting a representative set of life-cycle data to assess the larger body of processes and data developed to that point. It specifically identifies end-to-end traceability, objective-compliance analyses, structural coverage, quality-assurance records, and configuration-management records as possible subjects.
Sampling does not reduce the applicant’s obligation to satisfy every applicable objective. It is how the reviewer obtains evidence about whether the whole process is working without independently repeating the applicant’s work. A clean sample supports confidence; an inconsistency can justify expanding the sample or asking how broadly the condition applies.
Traceability shows whether the data belong together
The development chain begins above software. System requirements, interface definitions, architecture, and safety constraints provide inputs. Software high-level requirements state the behavior allocated to software. Lower-level requirements and design refine that behavior into an implementable structure, and source code implements the approved design.
A reviewer may select a thread and move downward through those levels, then select implementation data and trace upward. The purpose is not to admire the trace matrix. It is to determine whether each transition has technical meaning and whether the project can account for data that do not trace to an authorized source.
Forward traceability helps show that allocated behavior was implemented. Backward traceability helps expose unintended functions, orphan design elements, or code without a requirements basis. The links must lead to compatible content; a populated database does not help if the connected items describe different behavior.
Derived requirements deserve attention because they originate in the software process rather than flowing directly from a higher-level requirement. The plans should define how they are identified and communicated to the system and safety processes for evaluation. Treating derived requirements as an internal software detail can leave installation assumptions or safety effects outside the responsible process.
Consider one explicitly hypothetical thread. A system requirement calls for an alert within a defined response time. The software requirement identifies the triggering condition and timing, the design assigns monitoring and annunciation behavior, and the code implements it. If the design silently adds a persistence filter that changes the response time, the trace exists but the chain is not consistent; that added behavior needs an authorized requirements and safety basis.
Traceability also supports change impact. When one requirement changes, the project should be able to identify affected design, code, verification, interfaces, derived requirements, and records. If impact analysis relies on individual memory, the data are not yet functioning as a controlled assurance structure.
Standards and review records show how quality was built
Correct-looking output does not demonstrate that the development process was followed. The review also examines whether requirements, design, and code conform to the project’s controlled standards and whether required verification activities were performed with the planned independence.
Standards turn broad commitments into checkable criteria. A requirements standard can define identification, structure, attributes, and prohibited ambiguity. Design and coding standards can establish conventions, limitations, interface rules, complexity controls, and language or compiler restrictions. The content should fit the project’s methods and be specific enough for a reviewer to determine conformance.
Review and analysis records are evidence that development outputs were evaluated, not merely created. Useful records identify what was reviewed, which revision applied, who performed the activity, what criteria were used, what was found, and how corrective action was resolved. A signature without a reviewable trail may prove that someone approved a record while proving little about the technical activity.
Independence must match the software level and the objective being satisfied. The record should make the responsible roles visible without depending on an organization chart that changed months ago. If automated workflows assign reviews, their configuration and records should support the same conclusion.
Configuration management protects the meaning of every sample. Requirements, design, code, standards, tools, review records, and trace data need identifiable versions and controlled relationships. A reviewer cannot assess a source file against a design revision that was never the basis for that build.
Software Quality Assurance (SQA) adds process oversight. SQA evidence can show whether controlled plans and standards are being followed, whether deviations are authorized, whether records are retained, and whether corrective actions are closed. The review is therefore not limited to technical artifacts; it examines the controls that make those artifacts trustworthy.
Partial data should reveal a stable process
A development review does not require every requirement, design element, and source file to be complete. The archived Job Aid frames the review around sufficiently mature design data and selected threads, while FAA Order 8110.49A leaves the actual scope to project coordination. The exact maturity point should be agreed, not assumed from a generic percentage.
Partial data are useful when they represent the process the remaining data will follow. A coherent sample should include developed artifacts, their traces, reviews, configuration status, quality records, and resolved anomalies. Presenting isolated “best” documents can hide whether the normal workflow produces the same quality.
The team should explain what is complete, what remains in work, and which decisions could still change the sample. Preliminary data should be clearly identified. Open items should have owners and paths to resolution, and their effect on dependent work should be understood.
Process drift is a larger concern than incompleteness. If engineers have adopted conventions that differ from the standards, if review criteria have changed informally, or if traceability is being repaired after development, the selected data may expose a gap between the planned process and the real one. The response is to assess scope and correct the system, not to cosmetically repair only the sampled records.
The software level affects which objectives and independence provisions apply. What decides your DO-178C design assurance level? explains why that level comes from the installed system’s safety analysis and must remain connected to the software plans and data.
Prepare by tracing your own ordinary work
Do not prepare only a presentation. Select ordinary development data from more than one functional area and trace it in both directions. Confirm that the content agrees at each level, that derived requirements reached the right stakeholders, that review records identify the actual revision, and that configuration management can reproduce the relationships.
Then compare the data with the plans and standards. Look for local workarounds, undocumented conventions, skipped transitions, unresolved review comments, and tools used differently from their planned purpose. These are easier to address through the normal corrective process before the review than during a discussion about why the documented method and actual method diverged.
Coordinate the review scope, data availability, participants, and agenda. FAA Order 8110.49A calls for these arrangements so the appropriate people and evidence are available. A desk review and an on-site review create different access to personnel, automation, and the development environment; prepare for the format actually agreed.
Finally, make the development story navigable by someone outside the implementation team. A reviewer should be able to begin with a selected item, identify its source and downstream implementation, examine the applicable verification and control records, and understand any open condition without relying on tribal knowledge.
What Happens When the FAA Looks at Your Software? SOI Reviews, Explained provides the overall review sequence. This spoke’s narrower point is that development evidence is credible when the project can demonstrate connected data and repeatable processes while the life cycle is still in motion.
Why DO-178C Costs More When Compliance Starts Late explains the cost of reconstructing requirements, traces, reviews, and baselines after implementation has already moved on.
The takeaway: development-review readiness is the ability to show that ordinary requirements, design, and code are technically connected, standards-compliant, verified, and controlled—not merely complete-looking.
As your next step, use AeroCert’s free public-tier checklist library and select the Requirements, Design, and Code checklist. Use it to sample your own development threads, standards conformance, review evidence, traceability, derived requirements, and configuration controls before coordinating the external review.
Primary sources
- FAA Order 8110.49A, Software Approval Guidelines, Chapters 1 and 2, for the current definitions of review and sampling, review methods, coordination arrangements, review objectives, and project-specific scope.
- FAA Software Review Job Aid, Revision 1, dated January 16, 2004, Part 3 section 3.2, for the historical SOI 2 development-review structure and typical development data. The archived Job Aid is not currently retrievable from the FAA website and is not presented as current FAA guidance.
- FAA Advisory Circular (AC) 20-115D, Airborne Software Development Assurance Using EUROCAE ED-12( ) and RTCA DO-178( ), for the recognized DO-178C means of compliance and applicant responsibility for applicable objectives and life-cycle data.
This article is educational guidance, not a project-specific compliance finding. Coordinate the review stage, maturity criteria, sample, data access, authority involvement, designee roles, and disposition process with the responsible certification authority and authorized representatives.