What does the FAA look at in your software plans?

The first software review can feel premature because the code may be incomplete or barely started. That is the point: the most useful planning review happens while the project can still change its process without undoing finished work.

Short answer: The certification authority examines whether your controlled software plans and standards form a complete, consistent, executable approach for satisfying the applicable DO-178B or DO-178C objectives. The review connects that approach to the system safety basis, software level, tools, suppliers, life-cycle data, and certification schedule before the project relies on it.

By AeroCert Institute — a federally recognized 501(c)(3) nonprofit organization founded by aviation safety professionals with FAA credentials. Reviewed August 2026.

The review asks whether the planned process can work

The familiar planning-stage review is about the process the team intends to execute, not about proving that the final software already complies. Its central question is practical: if the team follows these plans and standards, is there a credible path to satisfying the objectives that apply to this software?

Many programs organize software reviews around four familiar maturity points—planning, development, verification, and final—often called Stage of Involvement (SOI) 1 through SOI 4. That terminology comes from the Federal Aviation Administration’s (FAA’s) historical Software Review Job Aid. Current FAA Order 8110.49A does not mandate four reviews; the authority determines the scope and number of reviews, if any, for each project.

A planning review may be conducted by the FAA, delegated to an appropriately authorized designee, combined with another review, or tailored in another coordinated way.

FAA Order 8110.49A supplies the current review principle. A review may include reading life-cycle data, interviewing personnel, witnessing activities, sampling records, and participating in briefings. Its purpose is to give the authority visibility into implementation, objective evidence that the project follows its plans and procedures, and timely resolution of certification questions.

For a planning-stage review, the evidence is mainly directional. The reviewer is not looking for polished prose. The reviewer is looking for a process that is sufficiently defined, coordinated, controlled, and connected to the actual system so the team can execute it consistently.

Consistency matters more than document count

A planning set commonly includes the Plan for Software Aspects of Certification (PSAC), development and verification plans, configuration-management and quality-assurance plans, and the requirements, design, and coding standards. Separate tool, supplier, or technology-specific planning data may also be needed. Packaging can vary; the needed content and relationships matter more than whether every subject is placed in a particular file.

The reviewer looks across the set for agreement. The software level in the PSAC should match the safety basis. The verification plan should implement the verification strategy promised at the top level. The configuration-management plan should control the same data, baselines, tools, and environments named elsewhere. The quality-assurance plan should oversee the processes the project says it will perform.

Internal consistency matters too. Each plan should define enough of its inputs, activities, outputs, transition criteria, responsibilities, records, and change controls that the people doing the work can follow it. A plan that says reviews will occur “as appropriate” without defining what is reviewed, by whom, against what criteria, and what record is retained has described an intention, not an executable process.

Interfaces receive particular attention because software assurance depends on information controlled outside the software team. The planning set should explain how system requirements and safety constraints reach software, how derived requirements return to the system and safety processes, how hardware dependencies are managed, and how supplier data enters the applicant’s compliance showing.

The same discipline applies to software tools. The plans should identify the tools that affect life-cycle activities, state the intended use, and explain the qualification decision where the project takes certification credit through a tool. Naming a product without describing its role does not establish the planned assurance strategy.

One hypothetical example makes the distinction clear. A plan says all low-level requirements receive an independent review, while the staffing section assigns one engineer to create and approve those requirements. Each sentence sounds reasonable by itself, but together they describe a process the team cannot execute. A planning review should expose that conflict before requirements are produced under it.

Reviewable plans are controlled but still changeable

“Early” does not mean unfinished. The archived Job Aid describes the planning review as occurring after the planning process, when plans and standards are fairly mature and under configuration control, even if some details may still change. That balance remains useful: the material should be stable enough to review and early enough to correct.

Configuration control matters because the review must refer to an identifiable baseline. Review comments, decisions, and later changes need a known starting point. If the team and reviewer are looking at different revisions, even a good technical discussion can produce an unusable record.

Change is expected. The question is whether the project has a controlled way to evaluate and coordinate changes that affect its compliance approach. A revised life-cycle model, software level, supplier allocation, verification method, tool-credit decision, or use of a DO-178C supplement can affect more than one plan and may need renewed certification coordination.

Plans also need to be honest about maturity. An unresolved decision is not automatically a defect, but it should be visible. Record what is open, why it matters, who owns it, which data depend on it, and how it will be coordinated. Hiding an open method behind confident wording makes the plan less reviewable, not more mature.

This is why the software level should be established and traceable before the planning baseline hardens. What decides your DO-178C design assurance level? explains how the installed system’s safety assessment—not code size or team preference—drives that assignment.

The reviewer follows commitments into the project

A planning review is not isolated from later work. The plans become the reference for evaluating whether the project does what it proposed. Later development and verification evidence should show those processes operating, while the final summary should explain what was actually accomplished and identify justified departures from the planning baseline.

That continuity changes how a team should write. Avoid copying generic language that the project cannot demonstrate. If the plan commits to a review, trace, independence arrangement, transition criterion, or record, the later evidence needs to show it happened or explain a controlled change.

The review can also surface certification issues while alternatives remain available. Novel methods, reused software, alternative means of compliance, qualified tools, unusual architectures, and responsibilities split across organizations can change the required evidence or authority involvement. Early visibility lets the applicant and authority develop a shared understanding before implementation turns an assumption into infrastructure.

The applicant remains responsible for the compliance showing. The FAA or authorized designee may interpret the certification basis, examine the approach, sample evidence, and identify gaps, but does not design the applicant’s process or produce its life-cycle data. A reviewable plan makes that responsibility clear through named roles and workable interfaces.

This is also the economic purpose of planning-stage review. Why DO-178C Costs More When Compliance Starts Late shows how a process gap discovered after code and tests exist can force requirements recovery, traceability repair, repeated verification, and baseline reconstruction.

Prepare the planning baseline, not a presentation

Start by testing the planning set as one system. Compare names, levels, responsibilities, data, tools, environments, suppliers, schedules, and transition criteria across every plan and standard. Resolve contradictions or identify them openly before the reviewer has to infer which document controls.

Then walk a few planned paths without using project folklore. Can an engineer tell when a requirement is ready for design? Can verification determine which independence rule applies? Can configuration management identify what must be controlled? Can quality assurance identify which records demonstrate that a process occurred? Can a supplier understand what data the applicant expects and how findings return?

Confirm the review arrangements with the certification authority or authorized designee. FAA Order 8110.49A calls for agreement on scope, dates, locations, participants, agenda, data availability, procedures, resources, and how results will be communicated for an on-site review. Adapt those practical arrangements to the actual review format instead of assuming a standard agenda applies.

Finally, prepare people to explain the process they own. The strongest answer is not a memorized sentence from the PSAC. It is a consistent explanation supported by the controlled plan, the referenced procedure, and the organization’s real allocation of work.

What Happens When the FAA Looks at Your Software? SOI Reviews, Explained provides the high-level review arc. This spoke stays narrower: planning readiness means the project’s proposed route to compliance is coherent enough to execute and still early enough to improve.

The takeaway: a software plan is ready for review when the full planning set describes one controlled, internally consistent process that the actual team can execute and later prove it followed.

As your next step, use AeroCert’s free public-tier checklist library and select the Software Plans checklist and the combined PSAC/SAS checklist. Use them together to check plan content, cross-plan consistency, special considerations, responsibilities, schedules, and the connection between the proposed approach and the final accomplishment record.

Primary sources

This article is educational guidance, not a project-specific compliance finding. Coordinate the review scope, planning baseline, data availability, authority involvement, designee roles, and disposition process with the responsible certification authority and authorized representatives.